Back to search
HR 267 - 113

Hydropower Regulatory Efficiency Act of 2013

Became Public Law No: 113-23.

Bill Text Stats

Bill text analysis is not available for this record yet.

Affected Sectors

How to read this

Sectors are deterministic matches from official Congress.gov data and cached bill text. They are source-derived signals, not conclusions about intent or economic effect.

Evidence matches count official fields, normalized subjects, cached text snippets, or extracted entities that matched the sector rules.

Impact is a bill-level rollup used for sorting and filtering. It is not an economic impact estimate.

Confidence is the strongest individual match score behind that sector.

Evidence snippets show why a sector matched and can repeat when Congress.gov repeats the same phrase across official fields.

Energy
1 evidence matches
Impact 83% Confidence 78%

Hydropower Regulatory Efficiency Act of 2013 Became Public Law No: 113-23. Water Resources Development

CBO Cost Estimates

Official Congressional Budget Office cost estimate links associated with this bill through Congress.gov records.

How to read this

CBO estimates are official source documents with their own assumptions, scope, and publication dates. They can score a bill, a version of a bill, or a broader legislative package.

LawLinter stores the source link from Congress.gov and does not replace the CBO document. Use these cards as pointers for source review, not as independent fiscal advice.

CBO context shows source-attributed Congressional Budget Office cost estimates linked from official Congress.gov bill records. It is research context only; read the official CBO source document for assumptions, scope, and dates.

Campaign Finance Context

Related FEC/OpenFEC campaign-finance records for lawmakers and candidates tied to this bill through source-attributed legislative relationships. These are not donations to the bill itself.

How to read this

Amounts shown here are campaign-finance totals for sponsor or cosponsor-linked candidates and their committees in the displayed FEC cycle.

They are not donations to this bill, spending on this bill, or proof that money influenced or caused sponsorship, cosponsorship, votes, or legislative outcomes.

If multiple linked lawmakers have FEC records, this section can show multiple candidate cards and separate sponsor/cosponsor rollups.

Campaign-finance context uses source-attributed FEC/OpenFEC records that are related or relevant to the displayed bill, lawmaker, candidate, committee, or legislative relationship through deterministic links. It is research context only, not proof of influence, causation, endorsement, or that money caused a sponsorship, vote, or legislative outcome.

No FEC/OpenFEC campaign-finance context is currently linked for this bill.

Lobbying Context

Related LDA.gov filings where public lobbying activity descriptions reference this bill. These records are source-attributed research context, not evidence of influence or causation.

How to read this

LDA filings are public lobbying disclosure records. LawLinter links them here only when the filing activity text contains an exact-looking reference to this bill.

A filing can mention many issues, clients, agencies, or bills. A match should be treated as a pointer for review, not as a conclusion about why legislation changed or how any lawmaker acted.

Lobbying context uses source-attributed LDA.gov records that appear related to this bill through bill references in public lobbying activity descriptions. It is research context only, not proof of influence, causation, endorsement, lobbying effectiveness, or legislative intent.

No LDA.gov lobbying disclosure context is currently linked for this bill.

Summary

49 Public Law Nov 19, 2013

(This measure has not been amended since it was introduced. The expanded summary of the House passed version is repeated here.) Hydropower Regulatory Efficiency Act of 2013 - (Sec. 3) Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements. (Sec. 4) Amends the Federal Power Act to revise the limitation on the maximum installation capacity of qualifying conduit hydropower facilities that are eligible for an exemption from licensing requirements. Requires any person, state, or municipality proposing to construct a qualifying conduit hydropower facility to file with FERC a notice of intent to do so. Requires FERC, within 15 days after receiving such a notice of intent, to make an initial determination as to whether the facility meets the qualifying criteria. Waives license requirements for any conduit hydroelectric facility that: (1) uses for electric power generation only the hydroelectric potential of a non-federally owned conduit, (2) has a maximum installed capacity of 5 megawatts, and (3) is not currently licensed or exempted from license requirements. Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. Authorizes FERC to: (1) exempt from license requirements any electric power generation facility that utilizes for such generation only the hydroelectric potential of a conduit, and has an installed capacity or 40 megawatts or fewer; and (2) extend the preliminary permit period for up to 2 additional years beyond the 3 years otherwise allowed if it finds that the permittee has implemented activities under the permit in good faith and with reasonable diligence. (Sec. 6) Directs FERC to: (1) investigate the feasibility of issuing a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects. (Sec. 7) Directs the Secretary of Energy (DOE) to study: (1) the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such facilities to be upgraded or retrofitted with advanced commercially available technology; and (2) the technical potential of existing pumped storage facilities and new advanced pumped storage facilities to provide grid reliability benefits.

82 Passed Senate without amendment Nov 19, 2013

(This measure has not been amended since it was introduced. The expanded summary of the House passed version is repeated here.) Hydropower Regulatory Efficiency Act of 2013 - (Sec. 3) Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements. (Sec. 4) Amends the Federal Power Act to revise the limitation on the maximum installation capacity of qualifying conduit hydropower facilities that are eligible for an exemption from licensing requirements. Requires any person, state, or municipality proposing to construct a qualifying conduit hydropower facility to file with FERC a notice of intent to do so. Requires FERC, within 15 days after receiving such a notice of intent, to make an initial determination as to whether the facility meets the qualifying criteria. Waives license requirements for any conduit hydroelectric facility that: (1) uses for electric power generation only the hydroelectric potential of a non-federally owned conduit, (2) has a maximum installed capacity of 5 megawatts, and (3) is not currently licensed or exempted from license requirements. Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. Authorizes FERC to: (1) exempt from license requirements any electric power generation facility that utilizes for such generation only the hydroelectric potential of a conduit, and has an installed capacity or 40 megawatts or fewer; and (2) extend the preliminary permit period for up to 2 additional years beyond the 3 years otherwise allowed if it finds that the permittee has implemented activities under the permit in good faith and with reasonable diligence. (Sec. 6) Directs FERC to: (1) investigate the feasibility of issuing a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects. (Sec. 7) Directs the Secretary of Energy (DOE) to study: (1) the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such facilities to be upgraded or retrofitted with advanced commercially available technology; and (2) the technical potential of existing pumped storage facilities and new advanced pumped storage facilities to provide grid reliability benefits.

80 Reported to Senate without amendment May 14, 2013

(This measure has not been amended since it was introduced. The expanded summary of the House passed version is repeated here.) Hydropower Regulatory Efficiency Act of 2013 - (Sec. 3) Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements. (Sec. 4) Amends the Federal Power Act to revise the limitation on the maximum installation capacity of qualifying conduit hydropower facilities that are eligible for an exemption from licensing requirements. Requires any person, state, or municipality proposing to construct a qualifying conduit hydropower facility to file with FERC a notice of intent to do so. Requires FERC, within 15 days after receiving such a notice of intent, to make an initial determination as to whether the facility meets the qualifying criteria. Waives license requirements for any conduit hydroelectric facility that: (1) uses for electric power generation only the hydroelectric potential of a non-federally owned conduit, (2) has a maximum installed capacity of 5 megawatts, and (3) is not currently licensed or exempted from license requirements. Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. Authorizes FERC to: (1) exempt from license requirements any electric power generation facility that utilizes for such generation only the hydroelectric potential of a conduit, and has an installed capacity or 40 megawatts or fewer; and (2) extend the preliminary permit period for up to 2 additional years beyond the 3 years otherwise allowed if it finds that the permittee has implemented activities under the permit in good faith and with reasonable diligence. (Sec. 6) Directs FERC to: (1) investigate the feasibility of issuing a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects. (Sec. 7) Directs the Secretary of Energy (DOE) to study: (1) the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such facilities to be upgraded or retrofitted with advanced commercially available technology; and (2) the technical potential of existing pumped storage facilities and new advanced pumped storage facilities to provide grid reliability benefits.

81 Passed House without amendment Feb 25, 2013

(This measure has not been amended since it was introduced. The expanded summary of the House reported version is repeated here.) Hydropower Regulatory Efficiency Act of 2013 - (Sec. 3) Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements. (Sec. 4) Amends the Federal Power Act to revise the limitation on the maximum installation capacity of qualifying conduit hydropower facilities that are eligible for an exemption from licensing requirements. Requires any person, state, or municipality proposing to construct a qualifying conduit hydropower facility to file with FERC a notice of intent to do so. Requires FERC, within 15 days after receiving such a notice of intent, to make an initial determination as to whether the facility meets the qualifying criteria. Waives license requirements for any conduit hydroelectric facility that: (1) uses for electric power generation only the hydroelectric potential of a non-federally owned conduit, (2) has a maximum installed capacity of 5 megawatts, and (3) is not currently licensed or exempted from license requirements. Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. Authorizes FERC to: (1) exempt from license requirements any electric power generation facility that utilizes for such generation only the hydroelectric potential of a conduit, and has an installed capacity or 40 megawatts or fewer; and (2) extend the preliminary permit period for up to 2 additional years beyond the 3 years otherwise allowed if it finds that the permittee has implemented activities under the permit in good faith and with reasonable diligence. (Sec. 6) Directs FERC to: (1) investigate the feasibility of issuing a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects. (Sec. 7) Directs the Secretary of Energy (DOE) to study: (1) the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such facilities to be upgraded or retrofitted with advanced commercially available technology; and (2) the technical potential of existing pumped storage facilities and new advanced pumped storage facilities to provide grid reliability benefits.

79 Reported to House without amendment Feb 8, 2013

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.) Hydropower Regulatory Efficiency Act of 2013 - (Sec. 3) Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements. (Sec. 4) Amends the Federal Power Act to revise the limitation on the maximum installation capacity of qualifying conduit hydropower facilities that are eligible for an exemption from licensing requirements. Requires any person, state, or municipality proposing to construct a qualifying conduit hydropower facility to file with FERC a notice of intent to do so. Requires FERC, within 15 days after receiving such a notice of intent, to make an initial determination as to whether the facility meets the qualifying criteria. Waives license requirements for any conduit hydroelectric facility that: (1) uses for electric power generation only the hydroelectric potential of a non-federally owned conduit, (2) has a maximum installed capacity of 5 megawatts, and (3) is not currently licensed or exempted from license requirements. Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. Authorizes FERC to: (1) exempt from license requirements any electric power generation facility that utilizes for such generation only the hydroelectric potential of a conduit, and has an installed capacity or 40 megawatts or fewer; and (2) extend the preliminary permit period for up to 2 additional years beyond the 3 years otherwise allowed if it finds that the permittee has implemented activities under the permit in good faith and with reasonable diligence. (Sec. 6) Directs FERC to: (1) investigate the feasibility of issuing a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects. (Sec. 7) Directs the Secretary of Energy (DOE) to study: (1) the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such facilities to be upgraded or retrofitted with advanced commercially available technology; and (2) the technical potential of existing pumped storage facilities and new advanced pumped storage facilities to provide grid reliability benefits.

00 Introduced in House Jan 31, 2013

Hydropower Regulatory Efficiency Act of 2013 - Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements. Amends the Federal Power Act to revise the limitation on the maximum installation capacity of qualifying conduit hydropower facilities that are eligible for an exemption from licensing requirements. Requires any person, state, or municipality proposing to construct a qualifying conduit hydropower facility to file with FERC a notice of intent to do so. Requires FERC, within 15 days after receiving such a notice of intent, to make an initial determination as to whether the facility meets the qualifying criteria. Waives license requirements for any conduit hydroelectric facility that: (1) uses for electric power generation only the hydroelectric potential of a non-federally owned conduit, (2) has a maximum installed capacity of 5 megawatts, and (3) is not currently licensed or exempted from license requirements. Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. Authorizes FERC to: (1) exempt from license requirements any electric power generation facility that utilizes for such generation only the hydroelectric potential of a conduit, and has an installed capacity or 40 megawatts or fewer; and (2) extend the preliminary permit period for up to 2 additional years beyond the 3 years otherwise allowed if it finds that the permittee has implemented activities under the permit in good faith and with reasonable diligence. Directs FERC to: (1) investigate the feasibility of issuing a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects. Directs the Secretary of Energy (DOE) to study: (1) the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such facilities to be upgraded or retrofitted with advanced commercially available technology; and (2) the technical potential of existing pumped storage facilities and new advanced pumped storage facilities to provide grid reliability benefits.

Sponsors

Timeline

Aug 9, 2013

Signed by President.

Aug 9, 2013

Signed by President.

Aug 9, 2013

Became Public Law No: 113-23.

Aug 9, 2013

Became Public Law No: 113-23.

Aug 6, 2013

Presented to President.

Aug 6, 2013

Presented to President.

Aug 2, 2013

Message on Senate action sent to the House.

Aug 1, 2013

Passed/agreed to in Senate: Passed Senate without amendment by Unanimous Consent.(consideration: CR S6257)

Aug 1, 2013

Passed Senate without amendment by Unanimous Consent. (consideration: CR S6257)

Jun 3, 2013

By Senator Wyden from Committee on Energy and Natural Resources filed written report. Report No. 113-38.

Jun 3, 2013

By Senator Wyden from Committee on Energy and Natural Resources filed written report. Report No. 113-38.

May 13, 2013

Committee on Energy and Natural Resources. Reported by Senator Wyden without amendment. Without written report.

May 13, 2013

Committee on Energy and Natural Resources. Reported by Senator Wyden without amendment. Without written report.

May 13, 2013

Placed on Senate Legislative Calendar under General Orders. Calendar No. 71.

May 8, 2013

Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.

Apr 23, 2013

Committee on Energy and Natural Resources. Hearings held. Hearings printed: S.Hrg. 113-24.

Feb 14, 2013

Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

Feb 13, 2013

Considered as unfinished business. (consideration: CR H481)

Feb 13, 2013

Passed/agreed to in House: On motion to suspend the rules and pass the bill Agreed to by the Yeas and Nays: (2/3 required): 422 - 0 (Roll no. 40).(text: CR 2/12/2013 H439-440)

Feb 13, 2013

On motion to suspend the rules and pass the bill Agreed to by the Yeas and Nays: (2/3 required): 422 - 0 (Roll no. 40). (text: CR 2/12/2013 H439-440)

Feb 13, 2013

Motion to reconsider laid on the table Agreed to without objection.

Feb 12, 2013

Mr. Whitfield moved to suspend the rules and pass the bill.

Feb 12, 2013

Considered under suspension of the rules. (consideration: CR H439-441)

Feb 12, 2013

DEBATE - The House proceeded with forty minutes of debate on H.R. 267.

Feb 12, 2013

At the conclusion of debate, the Yeas and Nays were demanded and ordered. Pursuant to the provisions of clause 8, rule XX, the Chair announced that further proceedings on the motion would be postponed.

Feb 4, 2013

Reported by the Committee on Energy and Commerce. H. Rept. 113-6.

Feb 4, 2013

Reported by the Committee on Energy and Commerce. H. Rept. 113-6.

Feb 4, 2013

Placed on the Union Calendar, Calendar No. 4.

Jan 18, 2013

Referred to the Subcommittee on Energy and Power.

Jan 15, 2013

Introduced in House

Jan 15, 2013

Introduced in House

Jan 15, 2013

Referred to the House Committee on Energy and Commerce.

House Votes

No House roll call votes have been linked to this bill yet.

Amendments

No amendment records are currently available for this bill.
Compiled bill record. Bill pages combine Congress.gov source payloads, normalized relationships, cached text analysis, vote links, and deterministic sector/signal extraction. This is not an official government record or legal advice; use the official source link when accuracy matters.